CA License #1088204 · Serving Orange County, California(949) 507-9299
Grizzly Strong Construction logo

Apartment unit turns and multifamily upgrades in Orange County

Grizzly Strong Construction turns vacant apartment units and upgrades multifamily interiors across Orange County for owners and property managers. From paint, flooring and repairs to kitchen and bathroom upgrades, we price each unit in writing, keep a predictable schedule so units go back on the market quickly, and work around the residents who stay.

Request a Free Estimate
Flooring & Tiles — Large-format tile floor

What a unit turn or upgrade can include

  • Paint, patching and repairs between tenants
  • Flooring replacement, such as luxury vinyl plank
  • Kitchen upgrades: cabinets or refacing, counters, sinks and fixtures
  • Bathroom upgrades: vanities, tub and shower surrounds, fixtures
  • Lighting, outlets, hardware and doors
  • Repairs found at move-out, including water damage
  • Balcony, deck and exterior repairs, including work that follows an SB 721 inspection

Common problems, solved

Vacant days cost rent
We agree a standard scope and schedule per unit type so turns are predictable and fast.
Different scope in every unit
We walk each unit, price it in writing, and flag anything beyond the standard scope before we start.
Residents next door
We keep noise to agreed hours, protect common areas and clean up daily.
Hidden damage found at move-out
We document it with photos and price the repair before doing it.

Planning & materials

  • Agree a standard finish level per unit type to keep turns consistent
  • Choose durable, easy-to-repair materials for rentals
  • Kitchen and bathroom work that moves plumbing or electrical needs permits
  • Older buildings may contain lead paint or asbestos; test before disturbing it
  • Plan exterior and balcony repairs around inspection deadlines where they apply
PERMITS & CODE

Paint, flooring and like-for-like replacements often need no permit, but work that changes plumbing, electrical, structure or exterior elements usually does. Balcony and deck repairs that follow an SB 721 or SB 326 inspection may need permits. We confirm what applies with your city before we start.

Process & timeline

  1. STEP 1 · WITHIN DAYS OF MOVE-OUT WHERE POSSIBLE
    Unit walk
    We walk the vacant unit, photograph its condition and agree the scope with you.
  2. STEP 2
    Written price and schedule
    A per-unit price and the days the unit will be off the market.
  3. STEP 3
    Turn or upgrade
    Work done in an agreed order, with common areas protected and daily clean-up.
  4. STEP 4
    Hand-back
    A walkthrough with photos, so the unit can be listed.
CA LICENSE
#1088204
Verify on the CSLB website
SERVICE AREA
Orange County
Cities we serve
FREE ESTIMATE
(949) 507-9299
Licensed & bonded · owner-led

Unit Turns & Multifamily FAQs

How long does a unit turn take?

It depends on the condition and the scope. A standard turn is much faster than an upgrade. We give you a written schedule per unit.

Can you handle several units at once?

Yes. We can schedule several units and standardize the scope by unit type.

Do you do balcony repairs after an SB 721 inspection?

Yes. We repair balconies, decks and stairs found to need work, with permits where required.

RELATED SERVICES
Commercial Construction →Balcony Repair →Flooring & Tiles →HOA & Commercial Repainting →

Start your project.

Free consultation and estimate. We use your details only to respond to your inquiry.

(949) 507-9299
Serving Orange County, CA · License #1088204

Your information is used only to respond to your request. See our Privacy Policy.