Custom cabinet installation in Orange County
Grizzly Strong Construction measures, orders and installs custom and semi-custom kitchen and bathroom cabinets across Orange County, as part of a full remodel or on their own. We coordinate cabinet layout with plumbing, electrical, appliances and countertops so everything lines up on install day, and we confirm the price and lead time in writing after a site measure.
Request a Free EstimateCabinet options
- Custom-built cabinets sized to your room, including tall pantries and floor-to-ceiling runs
- Semi-custom lines with a wide choice of doors, finishes and organizers
- Shaker, slab, inset and traditional door styles
- Soft-close hardware, pull-outs, spice racks, trash pull-outs and corner solutions
- Crown, light rail, toe-kick and filler details for a built-in look
- Painted, stained and wood-grain laminate finishes
- Cabinet installation for bathroom vanities, laundry rooms and built-ins
Common problems, solved
Planning & materials
- Order after a field measure and signed-off layout; changes after ordering can cost time and money
- Cabinet lead time is usually the longest single wait in a kitchen remodel; we confirm it in writing
- Confirm appliance models and countertop material before cabinets are built, since cutouts depend on them
- Check walls and floors for level before installation and correct them, because cabinets inherit every flaw
- Plan electrical, plumbing and lighting locations before cabinets go in, not after
Replacing cabinets in the same layout often does not need a permit. A permit is commonly required when the work also moves walls, plumbing, gas or electrical circuits, which is typical in a full kitchen remodel. We confirm your city’s requirements before we price the work and prepare the permit package where one is needed.
Process & timeline
- STEP 1 · SAME WEEK WHERE POSSIBLEFree consultation and site visitWe look at the kitchen in person, take measurements and photos, and talk through what you need.
- STEP 2Written estimateA clear scope, materials and price in writing, with anything that could change the number called out up front.
- STEP 3Permits and approvalsWe prepare the permit package where one is required, and the paperwork an HOA or property manager asks for.
- STEP 4Build or repairOwner-led crew, protected work area, and a daily clean-up. Any hidden damage we find is shown to you before it is priced.
- STEP 5Final walkthroughWe go through the finished work with you, close out inspections, and hand over the paperwork.
Custom Cabinets FAQs
What is the difference between custom and semi-custom cabinets?
Custom cabinets are built to your exact dimensions and specifications. Semi-custom cabinets come from a manufacturer’s line with set sizes and many options for doors, finishes and organizers. We help you compare both for your space and budget.
How long do cabinets take to arrive?
It varies by line and finish, and is often several weeks. We confirm the lead time in your written estimate and schedule demolition around it.
Can you reface or paint my existing cabinets instead of replacing them?
Sometimes. If the boxes are sound and the layout works for you, new doors, drawer fronts and paint can change the look at a lower cost. We will tell you honestly if the boxes are worth keeping.
Do you install cabinets that I bought elsewhere?
In many cases yes. We check for damage and missing parts first so problems are found before the install day.


