Tenant improvement contractor in Orange County

Grizzly Strong Construction builds tenant improvements across Orange County: offices, retail stores, restaurants and service businesses fitted out for a new tenant or refreshed for an existing one. We work from your designer’s or architect’s drawings, coordinate permits and trades, schedule around the lease and the building’s rules, and give you a written scope and price after a site walk.

Request a Free Estimate
Interior & Exterior Painting — Exterior repaint, crisp trim lines

What a tenant improvement can include

  • Demolition of the previous tenant’s build-out
  • New walls, doors, ceilings and storefronts
  • Electrical, lighting and data rough-in
  • Plumbing for restrooms, break rooms and kitchens
  • Heating, cooling and ventilation changes coordinated with the building
  • Accessible restrooms, entrances and paths of travel
  • Flooring, paint, millwork and finishes

Common problems, solved

The lease starts before the space is ready
We schedule backward from your date, order long-lead items early and tell you up front where the permit timeline is the risk.
Unclear who pays for what
We price the work to match the lease’s work letter, so the landlord’s and the tenant’s shares are clear.
Accessibility upgrades triggered by the work
Alterations can require accessibility upgrades to restrooms and paths of travel. We identify them early so they are in the budget.
Building rules and other tenants
We follow the building’s hours, access and protection rules and coordinate noisy work with the property manager.

Planning & materials

  • Confirm the lease’s work letter, TI allowance and landlord requirements before design
  • Drawings by a designer or architect are usually needed for the permit
  • Accessibility upgrades may be required as part of the alteration
  • Change of use, such as office to restaurant, adds reviews and time
  • HVAC, electrical service and plumbing capacity should be checked against the new layout
  • Order storefront, doors, fixtures and equipment early
PERMITS & CODE

Tenant improvements usually need a building permit with plan review, plus electrical, plumbing and mechanical permits as the work requires. Fire review applies to sprinkler, alarm and exit changes, and food uses need health department approval. Requirements and review times differ by city; we confirm them for your space and coordinate the submittals.

Process & timeline

  1. STEP 1 · SAME WEEK WHERE POSSIBLE
    Site walk and lease review
    We walk the space with you, and your landlord or property manager where needed, and note what the lease and building rules require.
  2. STEP 2
    Scope and written estimate
    A clear scope, schedule and price in writing, with anything that depends on the drawings or the city called out up front.
  3. STEP 3
    Drawings, permits and approvals
    We coordinate drawings with your designer or architect, submit for permits, and prepare what the landlord, HOA or other agencies ask for.
  4. STEP 4
    Construction
    Work scheduled around your business and the building’s rules, including after-hours work where needed, with the site kept safe and clean.
  5. STEP 5
    Inspections and close-out
    City and agency inspections, a punch list with you, and the paperwork you need to open or re-let the space.
CA LICENSE
#1088204
Verify on the CSLB website
SERVICE AREA
Orange County
Cities we serve
FREE ESTIMATE
(949) 507-9299
Licensed & bonded · owner-led

Tenant Improvements FAQs

How long does a tenant improvement take?

It depends on the scope, the city’s plan check and lead times. Permits often take longer than construction. We give you a written schedule with the estimate.

Do I need an architect for a tenant improvement?

Most permitted tenant improvements need drawings from a designer or architect, and an engineer where structure or systems change. We can work with yours or recommend one.

What is a TI allowance?

It is money the landlord agrees to contribute toward the tenant’s build-out, set out in the lease. See our guide to TI allowances.

Can you work while the business stays open?

Often yes, with phasing and after-hours work. We plan it with you and the property manager.

Tenant Improvements guides

RELATED SERVICES
Commercial Construction →Unit Turns & Multifamily →Flooring & Tiles →Interior & Exterior Painting →

Start your project.

Free consultation and estimate. We use your details only to respond to your inquiry.

(949) 507-9299
Serving Orange County, CA · License #1088204

Your information is used only to respond to your request. See our Privacy Policy.